- Name of the project: Vinh Phu Bridge
- Location: Vinh Phuc, Phu Tho
- Year of commencement: 2021
- Year of completion: 2023
Vinh Phu Bridge is a key project of Vinh Phuc province, crossing the Lo River connecting Vinh Phuc and Phu Tho provinces, meeting the travel needs of the people. The bridge replaces Duc Bac ferry and contributes to promoting the socio-economic development of the two localities and the project area. The project is under construction in the period of 2020 – 2023.
Vinh Phu Bridge is over 509m long, the main bridge is Extradosed with a length of 290m, the main span is 130m long, the approach bridge on Phu Tho province is 70.75m long, the approach bridge on Vinh Phuc province is about 148.8m long. The bridge is designed to ensure 4 lanes for motor vehicles, the main bridge width is 19m, the approach bridge width is 16.5m, the design speed is 60km/h. The project has a total investment of over 540 billion VND.
TEDI carries out the work of establishing investment policies, architectural plans, surveying, project planning and surveying, designing construction drawings for the Extradosed main bridge.
Vinh Phu Bridge is one of the important items in the 5-year socio-economic development plan (2021 – 2025) of the two provinces of Vinh Phuc and Phu Tho.
The construction of Vinh Phu Bridge not only meets the needs of travel and trade, but also symbolizes the solidarity and close relationship between the people of Vinh Phuc and Phu Tho provinces.