- Project name: Bridge on connecting road from Cao Bo to Mai Son project.
- Location: Mai Son ward, Yen Mo dist., Ninh Binh prov.
- Year of commencement: 2017
- Year of completion: 2020
Highlights of the project
The main bridge is a box-girder bridge constructed by a balanced cantilever method. The span diagram is 46 + 70 + 46 m. The main bridge length is 162m. The total width of the bridge cross section is 13.75m.
Description of advanced science, technology and software application
The main bridge was modeled and calculated by RM V8i software, local calculated by Midas FEA; pile foundation was caculated by FB Pier. In the construction phase, control and calculation of camber by RM V8i.